Interior work for houses across Toronto and the GTA, run in an order that does not double back on itself.

Finished open plan living and kitchen space with pale oak flooring and white walls
What it is

An interior renovation is a sequence

Interior renovation is less about any single trade than about the order they go in. Each stage hides the one before it, so anything done out of turn has to be opened back up.

Rough work comes first. Walls move, and the licensed electrical, plumbing and heating trades run whatever sits inside a wall, under a floor or above a ceiling. Drywall, taping and primer follow, and finishes go last because everything ahead of them is dirty.

  • Protection of the rooms you are living in, then demolition
  • Framing and structural change, with a permit where one is required
  • Rough in for wiring, plumbing and ductwork by the licensed trades
  • Drywall, taping, sanding and primer
  • Flooring, stairs, doors, trim, cabinets and paint

The interior trades

Floor board being tapped into place with spacers holding the expansion gap at the wall

Flooring

Hardwood, engineered, laminate, vinyl plank and tile, laid over a subfloor we level and moisture check first.

Low expansion foam being worked into the shim space around a new window frame

Windows and Doors

Replacement windows, exterior doors and interior doors, fitted full frame or retrofit depending on the opening.

Newel post and balusters being fitted to a handrail with a clamp holding the joint

Stairs

Rebuilds and refinishing: treads, risers, stringers, posts, balusters and handrails, often after carpet comes off.

Cabinet being shimmed and levelled against a wall with a clamp joining two stiles

Kitchen

Demolition through rough in, cabinets, countertop templating and final fit, in the order that holds the date.

Row of drywall screws set just below the paper face along a stud

Drywall

New board, patches and ceiling repairs, hung and fastened so the wall reads flat afterwards.

Paper tape being bedded into compound at an inside corner with a corner trowel

Taping

Coat by coat over joints and fasteners, sanded back and primed before any paint goes near it.

Brush cutting a crisp paint line along masked window trim

Painting

Preparation, filling, caulking, priming and finish coats on walls, ceilings, trim and doors.

Rectangular duct takeoff being sealed with mastic and foil tape

HVAC

Furnaces, air conditioning, ductwork and ventilation, with gas and refrigerant work carried out by the licensed trades.

PEX crimp connection being made at a manifold with supply lines running off through joists

Plumbing

Rough in, supply lines, drains and fixtures, carried out by the licensed plumbing trade before the walls close.

Conductors being stripped and made up inside a device box

Electrician

Panel work, circuits, fixtures and rough in, carried out by the licensed trade and inspected where required.

How an interior project runs

01

Walkthrough

We measure and ask what you want changed. Older Toronto houses hide surprises behind the plaster and we say where we expect them.

02

Written scope

A quote listing what is included, what is not, and where the work stops. Anything needing a permit is named before it starts.

03

Protection and demolition

Floors and doorways are covered, demolition is contained, and debris leaves the site instead of sitting in your driveway.

04

Rough work and inspection

Framing first, then the licensed trades for wiring, plumbing and ductwork. Permitted work is inspected before it is closed in.

05

Finishes and hand over

Drywall, taping, paint, flooring and trim, then a walkthrough and a short list we close out.

What affects the cost of interior work

Interior pricing follows the work behind the finish far more than the finish itself. Two kitchens of the same size sit a long way apart when one keeps its layout and the other moves the sink.

Older housing stock is the other variable. Behind pre war plaster you can find knob and tube, an uninsulated exterior wall, undersized ductwork or a floor out of level.

  • How much is replaced like for like against how much actually moves
  • Whether a wall being taken out is carrying load
  • What the licensed trades must bring up to current requirements once a wall is open
  • The condition of the subfloor, the framing and the plaster behind the finishes
  • Access, including narrow side entrances and third storey rooms

Questions homeowners ask

Can we live in the house during the work?

For one room, usually, provided the area can be sealed off and you still have a bathroom and somewhere to cook. Any stage that takes the heat or the water off line is harder.

Top down, and dirty before clean. Structural and mechanical work first, then drywall and taping, then paint, then flooring and trim. Out of that order you pay twice.

Not always. New flooring, new doors or paint does not. Altering a wall, adding a bathroom, changing a window opening or finishing a basement generally does, and Toronto wants those inspected.

Demolition and drywall sanding are the dusty stages and nobody removes that entirely. Sealed openings, covered floors and cleaning as we go keeps most of it contained.

Those parts are carried out by the licensed trades. We coordinate them so the rough in happens before the walls close and an inspection does not stall the schedule.

Get a free quote

Tell us which rooms and what you want changed. We will measure and put a written scope together.

    Talk to us

    Address
    81 The East Mall, Etobicoke, ON M8Z 5W3

    Tell us the address, what the problem is and when you would like the work done, and we will come back to you with a written quote. If it is easier to talk it through, the phone is the fastest route.

    Planning an interior renovation?

    Send the rooms and the changes you have in mind and we will take it from there.